It has taken a long time, and we have missed another summer’s open days, but only a few more days’ work will see Number 10 ready for its steam test. At the time of writing, the refurbished boiler has been installed and the tank, chimney and cab put back in position. Steam pipes and blast [...]
The boiler destined for Number 10 has now moved to Israel Newton of Bradford for firebox caulking and adjustments to the regulator. It is expected to return within four weeks. Thereafter a big push will be on to have Number 10 back in steam in time for July open days. Meanwhile, the cosmetic restoration of [...]
The demolition of the buildings at Stranraer Town Station (which closed to passengers over 40 years ago) is now complete. All track has been left in situ meantime. At the request of ARPG, the demolishers were able to remove one of the two platform cranes from the goods shed and set it aside for us. [...]