|
|

27. Saddle tank in primer324 viewsThe tank from locomotive Number 19 has been given a coat of primer, prior to being lifted back into position on the engine. (Photo by Archie Thom)
|
|

28. Number 19 nearly complete389 viewsOn Saturday March 31st Number 19 was put back together. Here, the cab and bunkers have been put in place; all that is needed now is the tank. (Photo by Archie Thom)
|
|

29. Sentinel outside the shed335 viewsThe Sentinel locomotive was used for the necessary shunting moves. (Photo by Archie Thom)
|
|

30. Number 19 back together489 viewsAt last, Number 19 looks like a locomotive again. Much remaions to be done, of course; the locomotive will eventually appear in green livery as Bairds and Dalmellington Number 19. The stripped down Johnny Walker loco and the Sentinel stand on the same roa
|
|

08. Removing the ashpan392 viewsGetting Number 19's ashpan out of the way to make access to the firebox easier. (Archie Thom)
|
|

09. Freeing off the tube ends389 viewsJim inside the smokebox of Number 19, freeing up the ends of the tubes which have to come out. (Archie Thom)
|
|

13. Sentinel Repair402 viewsMichael working on the Sentinel's engine. (Archie Thom)
|
|

12. Keep the Fire Burning!468 viewsThe most important job in the shed is keeping the stove going! (Archie Thom)
|
|

06. General View inside the Shed643 viewsLeft to right, Number 19, the Sentinel, Number 10. (Archie Thom)
|
|

07. Number 19 in the Shed442 viewsNumber 19 stands over the pit of three road, with work going on to remove the boiler tubes. (Archie Thom)
|
|

11. The first tube comes out!447 viewsPhotograph by Archie Thom
|
|

10. Inside the Firebox393 viewsIan Middleditch working on the firebox tubeplate of Number 19. (Archie Thom)
|
|
|
|